Electric Power Research Institute (EPRI) Home Page

About | Newsletter | Site Index  

Software Development Requirements   

 You Are Here: Home > Software Requirements > Installation/Un-Installation

 Development Process:

  1. Concept Development
  2. Request for Proposal
  3. Contract Package
  4. Implementation
  5. Preproduction Test
  6. Final Acceptance Test
  7. Support & Maintenance

 Software Requirements:

 Software Type Matrix

Installation/Un-Installation

All EPRI software require installation and un-installation instructions in the software documentation (e.g., Software Manual).

The following questions need to be addressed in the instructions:

  • Are the instructions labeled and located in the software documentation?

  • Are the instructions clear and match the actions of the installation process?

  • Are all installation options explained?

  • Are any known incompatibility issues with other commonly available software explained?

  • Are any differences seen when installing the program on different operating systems explained?

  • Are any files not removed during the un-installation explained?


Careers | Contact EPRI | Copyright Policy | Privacy Statement | Terms of Use 
800.313.3774 or 650.855.2121
EPRI 3420 Hillview Avenue, Palo Alto, California 94304
© Electric Power Research Institute, Inc. 2001- All rights reserved